Valoris for Children and Adults of Prescott-Russell were plagued with leaks and other building issues. They desperately needed an overhaul of their roof. We did a complete roof replacement of the front section of the building to solve all the issues. We replaced over 2900 square feet of surface.
Composition:
- Kraft vapour retarder adhered with adhesive over steel deck
- 2.5″ ISO loose laid
- 1/8″ asphaltic protection board mechanically fastened to steel deck
- 180PP Base sheet torched adhered
- Stressply IV GARLAND cap sheet torch adhered
- 180PP membrane flashings torched adhered
- Stressply IV GARLAND cap sheet flashings torched adhered
- 26 gauge sheet metal copings